Vita Coventry – Offsite Drywall for Student Accommodation
- Client / Main Contractor: Bowmer & Kirkland
- Location:Coventry, UK
- Project Type: High-rise student accommodation fit-out
- Product Specification: British Gypsum (Glasroc & Duraline)
- Contract Value: £3 million
- Programme Duration: 59 weeks
The Challenge
The Vita Coventry project involved the complete fit-out of a major high-rise student residence. With over 800 student units to complete, the main contractor faced three key challenges:
1. Programme pressure
A 59-week schedule with no room for delays.
2. Waste reduction targets
Minimising plasterboard waste on site.
3. Compliance and safety
Ensuring fire-rated and acoustically compliant details.
Traditional drywall installation methods, with on-site cutting and manual handling, risked delays, dust, and inefficiency.
The Drywall Pro-Cut Solution
Drywall Pro-Cut supplied a full package of offsite manufactured drywall components, delivered floor by floor and labelled for easy installation.
Components Supplied
- 6,534 lm of Fire-Rated Deflection Heads (30mm Glasroc).
- 816 Builders Work Openings (15mm Duraline).
- 847 Door Set Drywall Linings.
Each element was precision cut and batched offsite, eliminating the need for on-site cutting, reducing dust, and saving valuable install time.
Measurable Outcomes
| Component | Quantity | Labour Hours Saved | Labour Days Saved | Waste Prevented (m²) | Waste Prevented (kg) |
|---|---|---|---|---|---|
| Deflection Heads | 6,534 lm | 408 | 51 | 11.23 | 268 |
| Builders Work Openings | 816 No. | 510 | 64 | 9.56 | 134.88 |
| Door Sets | 847 No. | 72 | 9 | – | – |
| Totals | – | 990 | 124 | 20.79 | 402.88 |
Key Results:
- 124 days saved across the programme.
- 402kg of plasterboard waste prevented.
- Cleaner, safer site with reduced dust and manual handling.
- Compliance assured with fire-rated Glasroc and acoustic Duraline boards.
Benefits for Student Accommodation Projects
1. Time Savings
Offsite production delivered ready-to-install components, ensuring programme certainty.
2. Health & Safety
Less cutting, less dust, and fewer tools on site reduced risk for operatives.
3. Sustainability
Over 400kg of plasterboard waste avoided, supporting BREEAM and LEED targets.
4. Quality Assurance
Precision cutting ensured every component met specification, improving inspection outcomes.
The phased deliveries and labelled components made the install seamless.
FAQs
How much time did offsite drywall save at Vita Coventry?
Is this approach scalable for other high-rise projects?
What compliance standards were met?
How does this help sustainability targets?
Can Drywall Pro-Cut deliver nationally?
Related Case Studies
Planning a student accommodation or high-rise residential project?
Speak to Drywall Pro-Cut today and discover how our offsite drywall solutions can save time, cut waste, and ensure compliance.
Call: 01827 213201 | Email: enquiries@drywallpro-cut.co.uk